Maschinen

Dampfkessel Vitomax 200 HS, Leistung 16 t / h bei 13 bar, Baujahr 2005

: 7452019

Guter Zustand 16 Tonnen / h Dampfkessel mit Zweistoffbrenner, hergestellt von Viessmann im Jahr 2005

Technical Details

  • Hersteller Viessmann
  • Hersteller-Typ Vitomax 200 HS
  • Gemacht im Jahr 2005
  • 16 t/h at 13 bar
  • Anwendung Industrielle Dampferzeugung
  • Capacity 14000 - 12000 kW
  • Water content 32.9/26.5 m3
  • Burner type Weishaupt WGGL 70/2 A ZM
  • Feed water pump Grundfos GR20-10
  • Operating hours approx 38800
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005

Steam boiler Vitomax 200 HS, capacity 16 t/h at 13 bar.

Three-pass boiler with economizer and Weishaupt duel fuel burner. The boiler was manufactured in year 2005 and it is compliant with the requirements of the Pressure Equipment Directive 97/23/EC and the TRD Regulations. Capacity is max 16 tons/h saturated steam at max 13 bar operating pressure. The flame tube is arranged centrally, offset slightly downwards; the hot gas flues of the second and third passes are arranged symmetrically above. Delivery includes boiler, separate economizer, burner, gas control valve train, safety valves, liquid fuel pump, one feed water pump and control cabinet.