Koneet ja laitteet

Höytykattila Vitomax 200 HS, kapasiteetti 16 t/h, 13 bar, vm 2005

: 7452019

Good condition 16 ton/h steam boiler with dual fuel burner, made by Viessmann in year 2005

Technical Details

  • Valmistaja Viessmann
  • Valmistajan tyyppimerkintä Vitomax 200 HS
  • Valmistusvuosi 2005
  • Kapasiteetti 16 t/h at 13 bar
  • Tuoteryhmä Höytyn tuotto teollisuudelle
  • Capacity 14000 - 12000 kW
  • Water content 32.9/26.5 m3
  • Burner type Weishaupt WGGL 70/2 A ZM
  • Feed water pump Grundfos GR20-10
  • Operating hours approx 38800
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005
  • Steam Boiler Vitomax 200 HS - year 2005

Steam boiler Vitomax 200 HS, capacity 16 t/h at 13 bar.

Three-pass boiler with economizer and Weishaupt duel fuel burner. The boiler was manufactured in year 2005 and it is compliant with the requirements of the Pressure Equipment Directive 97/23/EC and the TRD Regulations. Capacity is max 16 tons/h saturated steam at max 13 bar operating pressure. The flame tube is arranged centrally, offset slightly downwards; the hot gas flues of the second and third passes are arranged symmetrically above. Delivery includes boiler, separate economizer, burner, gas control valve train, safety valves, liquid fuel pump, one feed water pump and control cabinet.